A train 150 meters long is tracking at a speed of 72 km/h. How long will it take to pass a bridge 250 meters long? MCQ with Answer and Explanation

A train 150 meters long is tracking at a speed of 72 km/h. How long will it take to pass a bridge 250 meters long?
A. 22 seconds
B. 20 seconds
C. 24 seconds
D. 18 seconds
Answer: Option B
Solution (By JKExamLibrary)
Total distance = 150 + 250 = 400 meters. Speed = 72 * (5/18) = 20 m/s. Time taken = 400 / 20 = 20 seconds.

This question belongs to: Maths Time Speed and Distance

Discuss this Question (0)

No comments yet. Be the first to start the discussion!

Practice More Time Speed and Distance Questions

Question #1 Report Error
A boatman rows 1 km in 5 minutes along the stream and 1 km in 12 minutes against the stream. Find the speed of the stream.
A. 5 km/h
B. 4.5 km/h
C. 4 km/h
D. 3.5 km/h

Correct Answer: Option D


Explanation:
Downstream speed = 1 km / (5/60 hours) = 12 km/h. Upstream speed = 1 km / (12/60 hours) = 5 km/h. Speed of stream = (Downstream speed - Upstream speed) / 2 = (12 - 5) / 2 = 3.5 km/h.

This question belongs to: Maths Time Speed and Distance
Question #2 Report Error
Excluding stoppages, a bus travels at 54 km/h and including stoppages it travels at 45 km/h. How many minutes does the bus stop per hour?
A. 12 minutes
B. 15 minutes
C. 8 minutes
D. 10 minutes

Correct Answer: Option D


Explanation:
Stoppage time per hour = (54 - 45) / 54 = 9 / 54 = 1/6 hour. In minutes = (1/6) * 60 = 10 minutes.

This question belongs to: Maths Time Speed and Distance
Question #3 Report Error
A car covers four successive 3 km stretches at speeds of 10 km/h, 20 km/h, 30 km/h and 60 km/h respectively. Its average speed for this distance is:
A. 20 km/h
B. 30 km/h
C. 24 km/h
D. 25 km/h

Correct Answer: Option A


Explanation:
Total distance = 4 * 3 = 12 km. Total time = 3/10 + 3/20 + 3/30 + 3/60 = (18 + 9 + 6 + 3)/60 = 36/60 = 0.6 hours. Average speed = 12 / 0.6 = 20 km/h.

This question belongs to: Maths Time Speed and Distance